I have gotten a lot done in the last month. I have fitted and tack welded most of the tubes from the firewall to just aft of the door. I am currently working on the door bracing tubes. I started using string to help identify the angles needed for each tube. When the angle is determined, I go to http://www.metalgeek.com/static/cope.pcgi and use the online tube pattern program to generate a paper pattern. The sides have been much more time consuming com paired to the top and bottom section. Each tube has to be made twice, left and right, so progress sometimes seems slow. I currently have about 130 hours in the project. Below are current pictures.
Firewall side tubes, these were the first tubes joining the top and bottom sections.
Next is just ahead of the left door opening.
Door opening, left side:
This last picture is just aft of the door opening. In these pictures you can see how I use the string to see where the next tube will go and the welders magnet to position the last tube cut.
















































Recent Comments